The installation process of centralized heating system begins at the time of the building’s construction. The layout design for the placement of piping is carefully devised and marked by Heat-Con technical experts as the first step. After the approval of plan from the client, the fitting phase starts where the piping is placed accordingly into the under-construction floors and erected walls of the building’s gray structure.

The second step of the process comes after the completion and finishing of the site’s construction. At that point, the installation of boilers (outside the building), and radiators and towel warmers (inside the building) is skillfully done by our team of technicians in line with the points specified in the pre-approved layout plan.

The completion of installation processes is followed by the demonstration of system’s operational procedures to the client by our customer-focused staff. The practice is aimed at assuring customer comfort and client satisfaction at every step.